The ready pilot villa of Aurea Villas — a bright and elegant home with private pool, spacious terraces and a large customizable basement, now available to visit in Estepona Golf.
This is the pilot villa of Aurea Villas, a contemporary frontline golf development in Estepona Golf, designed to combine modern architecture, open spaces and natural light with beautiful sea and golf views. The villa is completed and can already be visited.
Set on a private 756 m² plot, the property offers 414 m² built area distributed over three levels, with bright interiors, floor-to-ceiling windows and seamless indoor-outdoor living. The main floor features a spacious open-plan living and dining area connected to a modern kitchen with island, opening directly onto generous terraces, pergola areas, garden and private pool.
Upstairs, the villa offers spacious en-suite bedrooms, including a beautiful master suite with walk-in wardrobe and private terrace. In total, the property enjoys around 124 m² of terraces designed to enjoy the Costa del Sol lifestyle all year round.
One of the standout features is the large basement area, delivered in raw condition to allow owners to personalise the space according to their lifestyle and needs. It can be transformed into a spa, gym, cinema room, wine cellar, entertainment area, office or additional bedrooms. The developer can also offer different upgrade and customisation options at an additional cost.
The villa also includes high-quality specifications such as underfloor heating, Daikin Altherma climate system, Miele appliances, BORA induction hob with integrated extractor and smart home pre-installation, combining comfort, design and functionality in one of Estepona’s fastest-growing residential areas.
Contact us to arrange a private visit to the pilot villa of Aurea Villas in Estepona Golf.